Tuesday, October 20, 2009

Up, Up, and Away

Today was another exciting day on the building site. They started to put up the tall worship center walls. Our staff toured the site this morning and prayed over each ministry area. We also prayed for the workers and specifically for the worker who was giving us the tour. I could tell that his heart was touched by our care and concern for him.



















Here are some other things which are happening on the site:

  • Denver Water – yes, Denver Water showed up and we had a pre-con meeting with Randy Duffy (Denver Water) , Joe Coco (our civil engineer), Philip Scott (Nelson Pipeline), and Fransen Pittman. Nelson Pipleline will be installing a fire hydrant at the east side of the property on Thursday/Friday. They will go off site and come back a week later (too much traffic on site right now due to the crane, paving, etc.) to do another fire hydrant on the northwest side of the building. Make a third mobilization a week later to install pipe where we currently have a tilt up pouring bed.


  • Paving of the north parking area was in full motion – just in time to alleviate the mud that will become our site after tonights forecast of rain/snow.













Be sure to visit the webcam to see the latest activites on th site - http://www.missionhills.org/about-us/new-campus/141

No comments:

Post a Comment